DONGGUANG COUNTY FEITIAN COLD ROLL FORMING MACHINERY CO., LTD.
Hebei, China
Diamond Member Since 2021
Audited Supplier
Manufacturer/Factory & Trading Company
Sample Available
OEM/ODM Service
Factory Tour
Floor Metal Steel Tiles Decking Panels Roll Forming Making Machine
Reference FOB Price: | US $5,000.00-300,000.00 / set |
---|---|
Min. Order: | 1 set |
Certification: | CE, ISO, BV,SGS |
---|---|
Customized: | Customized |
Usage: | Floor |
Transmission Method: | Electric |
PLC: | Delta |
Effecitive Width: | 837mm |
Basic Info
Max Thickness
1.2mm
Working Speed
10-15m/Min
Counter
Omron
Motor
Siemens
Pump
5.5kw
Chain
2inch
Language
English
Specification
18*1.55*1.3m
Trademark
RFM
Origin
Hebei, China
HS Code
84552210
Production Capacity
300sets/Year
Product Description
Profile drawing:
Usage:
Detailed description:
No. | Item | |
1. | Processing Material | PPGI,GI |
2. | Feeding Width | As drawing |
3. | Processing Thickness(mm) | 0.6-1.2mm or as your Customized |
4. | Material of Rollers | Cr15 |
5. | Diameter of Shaft | 90mm or as your Customized |
6. | Forming Speed | 10-15m/min or as your Customized |
7. | Roller Driven | 1.5 inch double Chain |
8. | Cutting Model | Hydraulic Cutting |
9. | Length Measurement | Encoder |
10. | Control Style | PLC |
11. | Operation Model | Touch screen |
12. | Total Power | 15+5.5KW |
13. | Voltage | 380V 50HZ 3Phase or As request |
14. | Dimension(mm) | About 12500*1500*1550MM |
15. | Weight | About 12.5T |
16. | Stations | 25 Stations |
17. | Installation Dimension | About 18m*2m |
18. | Workers | 2 |
Different views show:
Decoiling feeding and embossing
Frame and forming rollersControl box and cutting device
Final sheet
Note for use and maintenance
1),before use,you must check whether all connections are steady,whether bolts and nuts are
tightinstallation.when start the machine,you must make sure there are enough lubrication oil in
the case.
2),when start the machine commissioning,the machine should run idle,then check it carefully
such as noise,vibration and whether the oil window works smoothly,whether every parts movement
coordination.
3),You must cut off power when install the mould,move the motor belt and big gear by hand,turn
the workbench and make sure the slide up to the highest point.